Projects

Conner Creek Academy

General Contractor: Cunningham-Limp Work Description: Sanitary Storm Domestic Water Air Lines Gas Piping Process Piping Acid Waste

RepairClinic.com

General Contractor: Oliver/Hatcher Work Description: Sanitary Storm Domestic Water Air Lines Gas Piping

CMAC Industries

General Contractor – Oliver/Hatcher Work Description: Sanitary Storm Domestic Water Air Lines Gas Piping

Sygma Distribution Facility

General Contractor – Campbell/Manix Work Description: Sanitary Storm Domestic Water Air Lines Gas Piping Process Piping

Art Institute

General Contractor – Cunningham-Limp Work Description: Commercial Kitchen Sanitary Storm Domestic Water Air Lines Gas Piping

Valeo Thermal Systems

A 120,000 s.f. research and development North American headquarters facility for automotive engine cooling and A/C systems. The progressive building design includes a full height

H.P. Pelzer

A 35,000 s.f. laboratory/engineering facility where sound and vibration testing is performed on automotive components in sound-proof, atmosphere-controlled semi-anechoic chambers. The facility’s exterior facade was

LDM Technologies

A115,000 s.f. headquarters facility which features several distinctive design concepts such as a 5,000 s.f., twostory atrium, reflecting ponds, prototype shop, engineering center, and other